TCM is currently working on a new Heating Upgrade at UTAS providing a new gas supply throughout the site to 10 new gas boilers connecting into the existing heating system via plate heat exchangers, aloong with five new Heat Pump Chillers for other systems requiring mechanical cooling.Testing will commence in March to progressively bring buildings on line.This recently made the news with a RotaLift Helicopter landing two boilers and equipment onto difficult locations athe the Chemistry builing and the Morris Miller Library; all plant equipment landed safely.